Shijiazhuang Chemical Fiber Co. Ltd

Shijiazhuang City, Hebei Province, China

Upgrading an exciting industrial WWTP

Starting 2005 ROCtecs/BDP constructed a small trial basin to make a treatment study. The out coming data shows an excellent treatment result.

The two already constructed SBR basins were rebuild an equipped with All-in-one ROCtecs/BDP bio-process

 

Project Introduction: Shijiazhuang Chemical fiber Co., Ltd, WWTP

Short description:

This factory mainly produces caprolactam. The waste water has a high concentration of COD and NH₃-N. 

A biological treatment with common processes was quite difficult.

 

The existing waste water treatment includes: 

Oil separation tank + regulating tank + SBR + denitrification tank + contact oxidation tank + second sedimentation tank + effluent.

 

Waste water treatment after upgrading:  

Oil separation tank + regulating tank + All-in-one basin ROCtecs/BDP bio-process + effluent. 

 

Results after upgrading:

Total basin volume of Pre-treatment reduced by about 30% from before

The operation costs reduced by about 50% from the former costs. 

High improvement of the effluent COD.

Treatment capacity

3,000 m³/d

Water quality

 

CODCr

BOD5

SS

NH₃-N

TN

TP

pH

Influent (mg/l)

6,000 ~ 8,000

3,000 ~ 4,000

150

500

NA

NA

6 ~ 9

Effluent before upgrading (mg/l)

200 ~ 300

60

70

< 60

NA

NA

6 ~ 9

Effluent after upgrading (mg/l)

70 ~ 150

30

70

< 10

NA

NA

6 ~ 9

 

After a certain time of operation the collected data give us an impression of the differences between the two treatments:

Process comparison:  Shijiazhuang Chemical fiber Co., Ltd, WWTP

ITEMS

SBR + A/O + second sediment basin

ROCtecs/BDP equipped and operated process

Influent/Effluent (mg/l)

CODcr

Influent 

(mg/l)

6,000 ~ 8,000

6,000 ~ 8,000

Effluent 

(mg/l)

200 ~ 300

70 ~ 150

NH₃-N

Influent 

(mg/l)

500

500

Effluent 

(mg/l)

60

10

SS

Influent 

(mg/l)

150

150

Effluent 

(mg/l)

70

20

Land area (m²)

5.400

2,100

Treatment Capacity (m³/d)

1,500 ~ 1.700

2,400 ~ 2,800

Running cost (RMB/m³)

6,5 ~ 7,0

1,5 ~ 2,0

DO (mg/l )

2 ~ 4

0,3

MLSS (mg/l )

4,000 ~ 5,000

7,000 ~ 8,000

TN removal rate (%)

40 ~ 50

above 95

Load per volume(KgCOD/m³✳d)

0,65 ~ 0,75

1,89


 